We have experience across a wide range of conventional power generation and transmission developments, including:
- acoustic impact assessment for exploration projects (oil, gas and shale), including ground-borne vibration studies
- conventional power generation (coal, gas and nuclear)
- oil and gas pipelines (onshore and offshore construction impacts)
- planning, development consent order (DCO), environmental impact assessment (EIA) and environmental and social impact assessment (ESIA) for power generation projects and transmission lines and pipelines
- environmental permitting support for Part A (A1 and A2) and Part B activities
- best available technique assessments for permitted installations
- electrical substations, feeder stations, local substations and other electrical infrastructure
- electrical transmission lines (buried and overhead lines)
- corona discharge noise assessments
- carbon capture plants
- visual impact provision projects to bury transmission lines
- small-scale gas engine power plants, including combined heat and power systems
- management plans and compliance (construction, post-completion and annual monitoring)
- complaint investigation and plant diagnostics
- lender-financed projects (e.g., International Finance Corporation and World Bank)
- vibration isolation design
- supporting infrastructure, such as water pipelines, transportation and waste management
- renewable grid connections, inverters and substations.
Using current legislation and guidance, such as BS 4142:2014 and Environment Agency (EA) ‘Noise and vibration management: environmental permits’, our team liaises with local regulatory authorities, the EA and planners to determine baseline noise monitoring requirements and to conduct predictive noise modelling studies to quantify noise and vibration constraints. These studies often include cumulative assessments to determine the capacity of sites influenced by neighbouring developments. When issues occur, our team has experience of offering cost-effective mitigation designed to efficiently reduce operational noise and vibration to within legislative and regulatory guidance.
The team has experience of managing and working on projects from small-scale substation investigation through to nationally and internationally significant oil and gas processing facilities and pipelines through environmental statement chapters (for EIA development), international ESIAs, energy consents applications and DCOs to the satisfaction of local authorities and the government (i.e., the Planning Inspectorate).