Obtaining planning consent is an increasingly complex process because of the diversity of environmental and policy considerations.

The impacts of noise and vibration from a development can be significant. If not addressed, they can lead to problems throughout the planning phase. The challenge is usually increased with the size of the project. Early consideration of noise and vibration can be crucial to securing overall planning consent in an efficient and cost-effective manner. Intelligent and sympathetic layouts at the concept design phase can often limit longer term noise control costs and/or reduce the potential for a development being rejected outright.

RSK Acoustics has vast experience of working on large-scale projects, including

  • environmental impact assessments (EIA)
  • environmental and social impact assessments (ESIA)
  • development consent orders (DCO), nationally significant infrastructure projects (NSIP) in England and energy consents orders (ECO) in Scotland
  • developments of national significance (DNS) in Wales.

The team works through all phases of nationally and internationally significant projects, from feasibility and screening studies to scoping, environmental statement preparation and management plans. We understand the value and importance of synergies among other technical disciplines, such as ecology, sociology, landscape architecture, process engineering and design, to promote a holistic and sustainable approach through the life of the project.

Our team has managed and delivered a diverse range of projects in the transportation, renewables, conventional energy generation and transmission, process industry, defence, residential, commercial, water and minerals sectors. This experience covers Europe, the Middle East, East Africa and Australasia.

What we do

Concept design

Early involvement can translate to large-scale efficiency and economic savings later in the project. We can provide input for the early stage concept design, optioneering of site layouts, material considerations and development aspirations. We apply what we have learnt from one project to the next.

Feasibility

Noise and vibration assessments for the purposes of a feasibility study aim to identify and evaluate potential adverse effects resulting from a proposed project at an early stage so that measures can be incorporated into the design to reduce the risk of impact. It provides developers and clients with a risk-based approach to the feasibility of a project.

Gap analysis

We have a team of highly technical specialists with years of experience in undertaking peer reviews of environmental statement chapters, noise impact assessment reports, noise models, literature reviews and baseline chapters. We have undertaken gap analyses of previous EIA and ESIA projects to identify any shortfalls within those documents in order to bring the project up to regulatory or International Finance Corporation compliance.

Screening

The screening report builds on the feasibility study and provides high-level information on any major constraints from an environmental discipline, including acoustics. Our expansive experience enables us to provide intelligent input at an early stage.

Scoping

The acoustics team has considerable experience in preparing technical input for scoping reports for a wide range of developments, from wind farms to oil pipelines. Noise considerations set out the assessment criteria (including regulatory guidance) and identify potential sources, magnitudes and impacts of noise associated with a proposed project.

Preliminary environmental impact report – DCOs

The acoustics team has prepared several preliminary environmental impact reports (PEIR) for renewable projects, linear power infrastructure and energy generation projects. We have worked alongside project legal teams to ensure final submissions are considered compliant for submission.

The PEIR provides an initial overview of potential environmental impacts associated with a proposed DCO project or similar-sized development. It typically includes information on the project’s location, scope and potential environmental effects, serving as a precursor to a more comprehensive EIA. The PEIR is often part of the early stages of the environmental planning process, helping to identify key issues and guide further environmental assessments and decision-making.

Baseline chapter

We have undertaken baseline monitoring and reporting throughout the world for various large-scale projects, from linear infrastructure (transportation and transmission) to fixed processing facilities and power generation. We have a large fleet of laboratory-calibrated noise and vibration meters spread across our global offices in order to react quickly to project and client requirements. We are well versed in all phases of monitoring, from stakeholder and community engagement to logistical planning and installation or collection for a range of environments.

Environmental statement

We have prepared over 100 noise chapters to be included in various environmental statements for EIAs and ESIAs in the UK, the Middle East and Africa. We cover the entire process, including the baseline assessment, noise modelling, impact assessment, mitigation design, residual impact assessment and management plans. We have experience in working with a range of domestic, national and international regulatory guidelines. We can quickly and effectively develop impact significance matrices for projects.

Community engagement and public meetings

Noise is often quite an emotive and contentious subject and one that many communities will raise in public hearings and meetings. The team has attended and represented the client or project at numerous public hearings and meetings to provide information on noise and vibration. This includes tidal and wind energy, shale gas and large-scale transport schemes, such as HS2.

Noise and vibration control design

We have worked on many projects where we have designed and managed the implementation of noise and vibration control measures as part of a project. This enables us to provide effective, innovative and proven solutions to a range of noise and vibration issues.

Noise and vibration management plans

As part of many EIAs and particularly ESIAs, construction and operational (including commissioning and decommissioning) management plans are often required. The team is vastly experienced in the preparation of such documents and understands the content and methods of noise and vibration control available for a range of sectors and activities.

Appeals, training, consent implementation and enforcement

Understanding why a development was refused planning permission or is questioned by the regulator or lender is key to achieving a positive outcome. We deliver bespoke services to manage and submit written representations, attend appeal hearings and prepare evidence for public inquiry (both written and delivered orally). This full-service solution means we are well placed to lead training for decision-makers, particularly when emerging environmental challenges interface with the planning system.

Our experience covers workshops, committees, public inquiries and appeals. Once approval has been gained for a development, we can help you manage the discharge of conditions, seek variations, monitor compliance and deliver appropriate mitigation schemes throughout the operational phase.

Mark Underhill, Associate Director

“Noise and vibration assessments are integral to EIAs and ESIAs, as they provide critical insights into the potential effects of a project on both the environment and the surrounding community. These assessments help identify and evaluate the impact of construction, operation and decommissioning activities on local ecosystems, human health and overall wellbeing (accounting for social context, which can sometimes be lost in the numbers). Addressing these factors within the assessment process ensures that projects are not only environmentally sustainable but also socially responsible, promoting a harmonious coexistence between the development and the communities it affects.”